Wallboard Installation Steps And Precautions For Installing Wall Panels.

Nov 25, 2019

Lämna ett meddelande

Wallboards need to be installed first in the wall. The steps are also very important when installing the wallboards. It is easy to install errors when making mistakes. What are the wallboard installation steps? Want to use the wallboards on the walls. It also needs to be installed to ensure that it is not easy to make mistakes during installation. What are the precautions for installing wall panels?

First, what are the wall board installation steps?

Before installation, insert the wall panel from left to right into the skirting line. The starting block should be grooved from the corner to the corner. Place the expansion screw or steel nail 1.5 cm away from the mouth of the retaining wall (in the middle of the width of the plate). Note that the screw does not expose the face of the retaining wall. When a power switch or the like is still encountered during construction, a chisel can be used to cut a hole slightly smaller than the switch, and a positive angle can be used when the column is encountered. How to install the wallboard Apply special glue in the groove of the waistline, insert it into the concave and convex surface after a few minutes, and it must be 45° diagonally at the corner.

Second, what are the precautions for installing wall panels:

1. The wall panel construction should be made as a large hole and then installed as a hole.

2. Clean the dust on the construction work surface, and pop the position line of the partition wall on the wall and ceiling according to the design requirements, mark the door and window opening and pipeline orientation and reserve the hole, pop up the assembly line, and check the ground flatness. The depression is larger than 40mm. The stone concrete is smoothed and its strength reaches 2.5MPa to be constructed.

3. Apply the bonding agent to the bonding surface of the top and side edges of the wallboard. The thickness of the bonding agent should not be less than 5mm, and the coating should be even.

4. When the plate needs to be repaired, the wire is cut according to the actual size of the plate. The vertical slit is closed with cement mortar, and the micro-adhesive is still needed when splicing.

5, the wall panel should be fixed first wall panel rear door and window run-out board, first board after the whole board. When the wall panel is erected, the side can be squeezed tightly by the tamper rod, and the verticality and the flatness of the adjacent panel surface can be corrected in time to make the joint tight and straight, the gap should not be greater than 5 mm, and the extruded adhesive is scraped in time. Then, the wooden wedge is used to tighten the bottom of the wallboard.

6. After the wall panel is fully positioned, the bottom of the wallboard must be filled with 1:3 cement mortar, and all the joints should be treated with glass fiber mesh cloth.

7, the wall is installed, the curing time is not less than one week, the concrete strength of the joint is greater than 1. 5MPa to remove the wooden wedge, and fill the hole with mortar filling, it is strictly prohibited to knock and cut during the curing period to avoid wall vibration cracking.